Kayak Dock, Canoe Launch and Parking Lot Design
MARLIN is currently providing the Town of Cutler Bay with design services for the conversion and rehabilitation of the existing vacant land located at Lakes by The Bay in Cutler Bay into a new park which includes a handicap accessible canoe and kayak launch, fishing pier, one educational pavilion, and two recreational pavilions.
The proposed design will include ADA accessible meandering walking trials with environmentally sensible gravel walkways, and native hardwood hammocks landscape. The park shall consist of only environmentally sensible materials and shall be used by the school system as an outdoor teaching facility.
The project elements include 3 pavilions, ADA accessible paths/trails, floating Kayak Dock and Launch, bicycle amenities, general parking area, and an entry gate.
Project Information
Location
Cutler Bay, Florida
Client
Town of Cutler Bay
Services
Construction Management
Roadway Design
Surveying & Mapping
Transportation Planning